For support with earlier releases, to schedule product training, maintenance agreement updates or additional support, please contact Customer Care.įor more information about PipelineStudio, please contact Energy Solutions Sales Team by using the Contact Us Form.Ĭlick on the image to download the product brochure. Support of this product is managed by the Energy Solutions Customer Care team, contact details are available via the Customer Care support page. PipelineStudio is currently used by over 300 pipeline operators and consulting engineering firm worldwide and it is the premier solution for: Offering a unique combination of steady-state and transient simulation to design facilities and plan operations from a single product. It is the industry-leading pipeline design and engineering solution that combines graphical configuration and reporting tools with industry-proven simulation. (d) An operator must have records that document the current class location of each gas transmission pipeline segment and that demonstrate how the operator determined each current class location in accordance with this section.PipelineStudio combines the most robust and proven simulation engine with a user-friendly yet powerful set of features to offer a truly complete pipeline engineering tool on your desktop. Many industries are increasingly using HDPE pipe to replace concrete and steel mainlines because it is more flexible. The pipeline MAOP is the minimum value calculated for the platform and riser section, for the subsea pipeline section, and for all valves, flanges, pig launchers and other components. (2) When a cluster of buildings intended for human occupancy requires a Class 2 or 3 location, the class location ends 220 yards (200 meters) from the nearest building in the cluster. The graph below was prepared from values read off a similar graph in Steel and McGhees textbook. Calculate offshore steel pipe maximum allowable operating pressure (MAOP) from test pressure and design pressure (annex A847.2). Allowable stress for steel pipe is calculated from Table A-1 and Table K-1 US values (US units govern). Training and credentials that lead to job placement and the beginnings of a fulfilling career pathway are essential to our success as. (1) A Class 4 location ends 220 yards (200 meters) from the nearest building with four or more stories above ground. Calculate ASME B31.3 process piping wall thickness from temperature for low pressure steel pipe (Table A-1), high pressure steel pipe (Table K-1), and plastic piping. Sizes vary from 100mm, (4) to 1220mm (48) diameter. General Information All the pipelines are steel and operate at high pressure containing petroleum products or gas. (c) The length of Class locations 2, 3, and 4 may be adjusted as follows: pipelines, even those who do not appear in this booklet, should still be consulted regarding procedures to be followed when working close to their pipelines. (4) A Class 4 location is any class location unit where buildings with four or more stories above ground are prevalent. (The days and weeks need not be consecutive.) (ii) An area where the pipeline lies within 100 yards (91 meters) of either a building or a small, well-defined outside area (such as a playground, recreation area, outdoor theater, or other place of public assembly) that is occupied by 20 or more persons on at least 5 days a week for 10 weeks in any 12-month period. Welding of Pipelines & Related Facilities. All material from the PCI-1100 course, plus: General Construction Safety. (i) Any class location unit that has 46 or more buildings intended for human occupancy or Pipeline Construction Inspector Training 795. (2) A Class 2 location is any class location unit that has more than 10 but fewer than 46 buildings intended for human occupancy. (ii) Any class location unit that has 10 or fewer buildings intended for human occupancy. In this paper, a case study of a typical marginal field will be undertaken to design a natural gas. (b) Except as provided in paragraph (c) of this section, pipeline locations are classified as follows: Pipeline route and profile survey is also required to ascertain the minimum and maximum elevation of the pipeline, to know if there will be creek/river crossing and to understand the environmental condition of such terrain. (2) Each separate dwelling unit in a multiple dwelling unit building is counted as a separate building intended for human occupancy.
(1) A “class location unit” is an onshore area that extends 220 yards (200 meters) on either side of the centerline of any continuous 1- mile (1.6 kilometers) length of pipeline.
The following criteria apply to classifications under this section. (a) This section classifies pipeline locations for purposes of this part.